Client: BGIS Global Integrated Solutions Canada Location: West Popular River / Willow Creek, SK Duration of the Work: 80 Days
Start: August 24th, 2020
Substantial Performance: November 30th, 2020 Completion: December 11th, 2020
Engineer: MPE Engineering Ltd.
Project Description: Mechanical shed and water treatment system upgrades in two remote separate locations con-currently
Value of the Contract Work:
Scope Of Work: Supply and installation of onsite wastewater disposal system and associated civil work, including raw water pumps and distribution pumps, Mechanical, Electrical and Instrumentation systems, Underground piping to tie into existing Port facility and residential building water supply connections.
Self-Perform: Supervision, demolition, Concrete, Carpentry, Mechanical equipment, Piping, Coatings, Tank install and Electrical installation.